Transforming Aged Care Facilities - Group Homes Australia

B-MAC Constructions Constructions Pty Ltd was appointed by Group Homes Australia in a competitive tender to undertake the transformation of a traditional two-story, 4-bedroom home into an 8-bedroom state-of-the-art aged care facility. This project, located on New South Head Road, Rose Bay, demonstrates B-MAC Constructions’ commitment to excellence and innovation in creating a 24-hour care home primarily for dementia residents. The transformation resulted in a facility that marries elegant design with functional living spaces, including large, formal, and informal areas, spacious bedrooms, and luxurious gardens with outdoor entertaining spaces, all designed to provide a safe and comfortable environment for its residents.
Previous slide
Next slide

Project Deliverables

  • Customised Aged Care Facility Transformation: Converted a two-story 4-bedroom home into an 8-bedroom aged care facility, incorporating modern elements and specialised amenities tailored for dementia care.
  • Enhanced Living Spaces: Created expansive living and dining areas, equipped with air-conditioning, sprinkler, and lighting systems, offering a home-like environment that meets the unique needs of dementia patients.
  • Outdoor and Garden Spaces: Developed luxuriant garden areas and outdoor entertaining spaces, ensuring residents enjoy a well-appointed, secure outdoor environment.

Construction Methodology

B-MAC Constructions construction strategy involved retaining the existing structure while comprehensively refurbishing the interior and exterior to introduce new bedrooms, bathrooms, and essential modern amenities. The project demanded innovative solutions to overcome limited access from New South Head Road and minimal on-site storage, demonstrating B-MAC Constructions ‘ adeptness in managing logistical challenges in a busy urban setting.

Safety Report

A zero-incident safety record was achieved through diligent planning and execution of a site safety plan, including job safety analysis and risk assessments. Regular safety meetings, site inspections, and the monthly testing of electrical equipment ensure a secure working environment for the average daily workforce of 20, peaking at 40.

The Group Homes Australia Rose Bay project stands as a testament to B-MAC Constructions Constructions’ ability to deliver complex projects that exceed client expectations. The facility’s transformation was not only within budget and schedule but also achieved high standards in functionality, aesthetics, and quality, providing a warm, appealing, and safe space for dementia residents.

This project highlights B-MAC Constructions Constructions Pty Ltd’s excellence in adapting existing structures to meet specific care requirements, showcasing their innovative approach and commitment to creating specialised care facilities that offer both comfort and security.

Have Aged Care Commerical Construction Project?

Construction and Building Maintenance for Knox Grammar, Sydney

Construction and Building Maintenance for Knox Grammar, Sydney Wahroonga, Sydney B-MAC Constructions began working with Knox Grammar School, a prestigious educational institution, in August 2016. Initially focused on routine maintenance, the partnership quickly evolved as B-MAC demonstrated their ability to handle diverse and intricate projects. From classroom refurbishments and boarding

Read More »

Award-Winning Refurbishment of Bomaderry Bowling Club, NSW

Award-Winning Refurbishment of Bomaderry Bowling Club, NSW Bomaderry, NSW B-MAC Constructions Constructions Pty Ltd undertook the refurbishment project for Bomaderry Bowling Club following a competitive tender process with local contractors. The project, executed with four months, aimed to modernise the club’s amenities while ensuring minimal disruption to its daily operations.

Read More »

Award-Winning Refurbishment of Club Cronulla

Award-Winning Refurbishment of Club Cronulla Cronulla, Sydney B-MAC Constructions Constructions Pty Ltd swiftly showcased their exceptional skill and rapid response following a severe storm at Club Cronulla. Upon receiving an urgent call from the club’s Assistant Manager at 7:00 am, B-MAC Constructions deployed a crew to the site within two

Read More »